Roofing
Updated Sep 1, 2026

Roof Flashing Calculator

Calculate drip edge, valley flashing, step flashing, vent boots, and chimney/skylight kits for your roof. Imperial and metric.

How to Estimate Roof Flashing

Flashing seals the joints where the roof meets walls, chimneys, skylights, valleys, and roof penetrations. Most roof leaks are flashing failures, not shingle failures, so accurate estimating and proper installation are critical.

Drip Edge

Drip edge L-shaped metal flashing is required (IRC R905.2.8.5) along every eave and rake. Standard 10 ft pieces overlap 1/4 inch. Total pieces equal eave plus rake perimeter divided by 10, plus 5% waste.

Drip Edge Pieces=Perimeter10×(1 + 5%)

Step Flashing

Step flashing installs at every shingle course where the roof meets a vertical wall (sidewall of a chimney, a dormer, or a wall intersection). Each piece is 5 inches wide x 7 inches tall with about 5 inches of horizontal exposure:

Step Pieces=Wall Length×125

Flashing Reference Table

LocationTypeMaterial
Eaves & rakesDrip edgeAluminum or steel
ValleysW-valley flashingAluminum or copper
Chimney sidewallStep + counterAluminum or copper
Vent stackBoot / pipe collarRubber + metal
SkylightSkylight kitAluminum (mfr supplied)
Replace Vent Boots Every Reroof
The rubber collar on plumbing vent boots dries out and cracks in 10 to 15 years - the most common cause of attic water stains. Always replace vent boots when reroofing, and consider lifetime metal Oatey-style boots for long-term reliability.

Frequently Asked Questions